Rivesville Power Station – Rivesville, West VA
Precision Environmental Company performed regulated material abatement preparing the 142 megawatt plant for decommissioning and site demolition activities.
The scope of work included the removal and disposal of 16,000 square feet (sf) asbestos-containing thermal insulation associated with two coal-fired boilers, as well as miscellaneous asbestos-containing materials (transite, flooring systems, electrical wire and components).
Owner:
Bet Tech Construction Co.
Range:
>$2,000,000
Location:
Rivesville, WV
Summary:
Plant Status- Full Environmental Decommissioning
EHS Consultant – Mid Atlantic Environmental Consultants
Precision Environmental Company performed regulated material abatement preparing the 142 megawatt plant for decommissioning and site demolition activities.